Spec errors fell from 15% to under 1%. One change is now made once, not 50 times.
An apparel manufacturer owned by a private equity fund kept more than 2,000 product specs across PowerPoints, Excel files, email and its ERP. A single label change could mean hand-editing about 50 of them.
Case study · Workflow & Process AutomationA large spec change
About two weeks
Same day
Spec error rate
Roughly 15%
Under 1%
Specs edited per change
About 50, by hand
1 product record
The situation
A spec tells the factory how to build a product, right down to the label. At this apparel PortCo, more than 2,000 of them lived in various PowerPoints, Excel files, email threads and the ERP.
When an engineering or label change came through, it could touch around 50 specs. As such, a large change took about 2 weeks to work through, and roughly 15% of specs reached the factory floor with a mistake in them.
The real problem
Design, technical design, product management and the floor all worked from different versions of the same product spec. Something as minor as a label change could impact 50 documents, and with several teams manually altering each, error rates were high. The company needed a single record that each team could work from.
The solution
LightSight built one product record that all four teams work from.
The record reads from the ERP and writes approved changes back to the system.
- 1
A change now starts as a request from design or the floor.
- 2
It gets applied once, to the product record.
- 3
Before anything is released, the tool checks the labels and cutting files against the company's rules and stops anything that breaks them.
- 4
Each team then opens its own view of the same released spec from within the system.
The result
The company expects a full-year spec error rate of <1%, from 15%. The company is now also working to cut concept-to-production from nine months to six. LightSight estimates that would be worth about $4.1M a year in added revenue and about $436k a year in cost savings, or roughly $817k a year in EBITDA and $10.5M in enterprise value at exit.
The cost of waiting
Every month on the old process sent more wrong specs to the floor, took considerable time, and delayed product launches.
Creating workarounds and settling for the old process was costing the design team hours they should have spent designing, and costing the company revenue from delayed launches.
A two minute task versus a ... two week task.